About Us
We specialize in Short Circuit and Coordination Studies for medium-voltage and low-voltage power systems Arc Flash Hazard Assessments and studies for Equipment Evaluation, Transient Motor Starting, and Harmonic Analysis. We also provide Electric Power Distributions Systems Design and Service Planning, including load analysis, system layout and calculations to size cables, conduits, transformers, protective devices and panels, low resistance grounding systems, power factor correction and rate analysis.
To assist in your efforts to provide safer working conditions, we provide a turn-key approach for your Arc Flash Hazard Assessment that includes the following:
- Data Collection
- Power System Modeling
- Short Circuit & Coordination Study
- Arc Flash Hazard Evaluation Study
- Report Analysis & Recommendations
- Arch Flash Labels
- Install Protective Device Settings and Labels
- Arc Flash Training for Personnel
Power Quality Audits
Industrial Tests, Inc. offers pre and post installation power quality audits plus standard and specialized power system studies to precisely target and help correct power issues. These studies will also help to optimize power performance. Our studies are performed in accordance with applicable industry standards from the Institute of Electrical and Electronics Engineers (IEEE), American National Standards Institute (ANSI), National Fire Protection Association, and the National Electrical Code.
Arc Flash Analysis
The arc flash study will enable proper boundaries to be established around electrical equipment and indicate the appropriate level of protective clothing to be worn. Study data for Arc Flash Hazard Analysis can come from many sources, such as present and future utility feeds, or motors and generators. Load data may include existing and proposed loads as shown on the owner's or contractor’s documents. Analysis will be based on the present configuration using IEEE-1584. The arc flash hazard analysis study is conducted by an electrical engineer skilled in performing and interpreting power system studies. Study results of the Arc Flash Hazard Analysis will be used to define the flash protection boundary and the incident energy at work-site locations in the electrical distribution system. Necessary Personal Protection Equipment (PPE) will be suggested based upon Table 3-3.9.3 of NFPA 70E-2000. Safe working distances will be specified for calculated fault locations based upon the calculated arc flash boundary considering an incident energy of 1.2 cal/cm2.
Our company is based on the belief that our customers' needs are of the utmost importance. Our entire team is committed to meeting those needs. As a result, a high percentage of our business is from repeat customers and referrals.
We would welcome the opportunity to earn your trust and deliver you the best service in the industry.
Location:
Industrial Tests, Inc.
4021 Alvis Court
Suite 1
Rocklin, CA 95677
Hours:
Mon - Fri: 9AM - 5PM
Sat: 10AM - 5PM
Sun: Closed